A Project of Immense Proportions
Situated in the heart of the Gujarat(India) region, Gandivchem’s Mega Greenfield Marine Chemical Project sprawls over a vast area of 147 sq. km. With a state-of-the-art facility, advanced technology, and modern manufacturing processes, we at Gandivchem are singularly placed to take leadership in the marine chemicals segment.
Bromine
21,000 MTPA
Infrastructure
Reliability And Efficiency
This means that well-coordinated unit operations and processes are assured of continuous production without a hitch, hence our ability to deliver the exact quantity and quality of products. Such an efficient system meets customer demands on time and as required while reflecting our commitment to excellence and reliability in every aspect of our operation.


Co Gen Unit
Gandiv Chem has setup a 4.9 MW co-generation plant in the plant premises to produce power and steam. We also have the ability to increase the capacity of the Co-generation unit

Storage Unit
Gandiv Chem has a 1.5 MLD desalination unit whereby seawater is sourced into large a reservoir from where it is desalinated. RO water produced from here is used in the Bromine Plant, and is used in the co-generation plant as well.

Pumping Stations
We also have 3 pumping stations to pump huge volumes of seawater into our site, so as to facilitate and produce larger quantities of industrial salt and bromine.
The GANDIV CHEM plant is a technological marvel with world-class, proven technology like:
- State-of-the-art bromine manufacturing plant with proven German technology
- De Dietrich Process Systems from GmbH Germany
- QVF® Borosilicate glass and De Dietrich® glass-lined steel
- Siemens DCS Systems
- Power generation plant by TDPL Germany
- ISO containers by JL Gosler, Germany
- Highly automated plant with minimal human intervention
- Ultra-modern lab with world-class equipment
- Zero discharge plant
18 months
completion time of engineering, procurement, construction and commissioning of Project across 15,000 Ha
3,50,000 m3
of total concrete used
80 Km
of electrical cables
510 Km
of approach roads and bunds infrastructure
3,500 MT
of Reinforcement steel
50 Km
of instrument cables